stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

2375 EAST 3 STREET

Brooklyn · ZIP 11223 · BIN 3194735 · Gravesend (East)-Homecrest · On record since Apr 23, 1996 · Built 1957

NeighborhoodⓘGravesend (East)-Homec…
Worse than most buildings in Gravesend (East)-Homecrest
More complaints than 71% of residential buildings in Gravesend (East)-Homecrest over the last 10 years. Size-normalized by building volume.
71st pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 47% in the last 2 years (25 vs 17 prior 2 yrs)
50250'21'26
Complaint SeverityⓘLast 10 years
About as many serious complaints as similar buildings
29 Priority A and B complaints over 30 years — 1.0 per year on average. Size-normalized by building volume.
1.0/yr57th pct(med. 0.0/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 1996
81
2 active
Total Priority Aⓘ
7
Total Priority Bⓘ
22
1 active
No Access for Inspection (past 5 yrs)ⓘ
4%
2 complaints
Complaints over time
5 yrsAll time

First filed Apr 23, 1996. Latest: Mar 23, 2026.

Top complaint types
5 yrsAll time
A — ImminentB — SeriousC — StandardD — Minor
Complaint log
2total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
Mar 23, 2026

Failure to Retain Water/Improper Drainage (LL103/89)

85

CACTIVE—
See something wrong? File a complaint with 311
—
Mar 6, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVEApr 16, 2026

Inspector unable to gain access - 1st attempt

CACTIVE
Mar 23, 2026
Failure to Retain Water/Improper Drainage (LL103/89)
85
BACTIVE
Mar 6, 2026
Boiler: Defective/Inoperative/No Permit
58
Closed Apr 16, 2026

Inspector unable to gain access - 1st attempt