stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

963 WOODYCREST AVENUE

Bronx · ZIP 10452 · BIN 2003187 · Highbridge · On record since Mar 30, 1998 · Built 1924

NeighborhoodⓘHighbridge
Among the most complained-about buildings in Highbridge
More complaints than 100% of residential buildings in Highbridge over the last 10 years. Size-normalized by building volume.
100th pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 29% in the last 2 years (330 vs 255 prior 2 yrs)
2101050'21'26
Complaint SeverityⓘLast 10 years
Among the highest rates of serious complaints nearby
764 Priority A and B complaints over 28 years — 65.4 per year on average. Size-normalized by building volume.
65.4/yr100th pct(med. 0.2/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 1998
892
32 active
Total Priority Aⓘ
183
Total Priority Bⓘ
581
30 active
No Access for Inspection (past 5 yrs)ⓘ
18%
120 complaints
Complaints over time
5 yrsAll time

First filed Mar 30, 1998. Latest: Jun 12, 2026.

Complaint log
892total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
Jun 12, 2026

Zoning: Non-Conforming

55

DACTIVE—
See something wrong? File a complaint with 311
Top complaint types
5 yrsAll time
A — ImminentB — SeriousC — StandardD — Minor
—
May 30, 2026

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDJun 1, 2026

No violation warranted for complaint at time of inspection

May 30, 2026

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDJun 1, 2026

No violation warranted for complaint at time of inspection

May 21, 2026

Illegal Conversion

45

BACTIVE——
May 5, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
May 2, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
May 1, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 30, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 29, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 29, 2026

No violation warranted for complaint at time of inspection

Apr 29, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 29, 2026

No violation warranted for complaint at time of inspection

Apr 27, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 27, 2026

Please see complaint number

Apr 27, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 27, 2026

Please see complaint number

Apr 26, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 26, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 27, 2026

Please see complaint number

Apr 26, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 27, 2026

Please see complaint number

Apr 25, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 24, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 24, 2026

Please see complaint number

Apr 24, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 24, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 24, 2026

Please see complaint number

Apr 22, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 22, 2026

No violation warranted for complaint at time of inspection

Apr 22, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 22, 2026

No violation warranted for complaint at time of inspection

Apr 22, 2026

Zoning: Non-Conforming

55

DACTIVE——
Apr 21, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 20, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 20, 2026

No violation warranted for complaint at time of inspection

Apr 19, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 17, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 18, 2026

No violation warranted for complaint at time of inspection

Apr 17, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 18, 2026

No violation warranted for complaint at time of inspection

Apr 12, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 8, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 8, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 8, 2026

Please see complaint number

Apr 8, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 8, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 8, 2026

Please see complaint number

Apr 7, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 7, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 7, 2026

No violation warranted for complaint at time of inspection

Apr 7, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 7, 2026

No violation warranted for complaint at time of inspection

Apr 6, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 6, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 6, 2026

No violation warranted for complaint at time of inspection

Apr 5, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 5, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 4, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 3, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 2, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDApr 3, 2026

No violation warranted for complaint at time of inspection

Mar 30, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 29, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 29, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 29, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 28, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 28, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 27, 2026

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDMar 29, 2026

No violation warranted for complaint at time of inspection

Mar 27, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
DACTIVE
Jun 12, 2026
Zoning: Non-Conforming
55
BCLOSED
May 30, 2026
Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit
23
Closed Jun 1, 2026

No violation warranted for complaint at time of inspection

BCLOSED
May 30, 2026
Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit
23
Closed Jun 1, 2026

No violation warranted for complaint at time of inspection

BACTIVE
May 21, 2026
Illegal Conversion
45
BACTIVE
May 5, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
May 2, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
May 1, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 30, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 29, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 29, 2026

No violation warranted for complaint at time of inspection

ACLOSED
Apr 29, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 29, 2026

No violation warranted for complaint at time of inspection

ACLOSED
Apr 27, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 27, 2026

Please see complaint number

ACLOSED
Apr 27, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 27, 2026

Please see complaint number

BACTIVE
Apr 26, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 26, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 27, 2026

Please see complaint number

ACLOSED
Apr 26, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 27, 2026

Please see complaint number

BACTIVE
Apr 25, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 24, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 24, 2026

Please see complaint number

BACTIVE
Apr 24, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 24, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 24, 2026

Please see complaint number

ACLOSED
Apr 22, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 22, 2026

No violation warranted for complaint at time of inspection

ACLOSED
Apr 22, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 22, 2026

No violation warranted for complaint at time of inspection

DACTIVE
Apr 22, 2026
Zoning: Non-Conforming
55
BACTIVE
Apr 21, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 20, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 20, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Apr 19, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 17, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 18, 2026

No violation warranted for complaint at time of inspection

ACLOSED
Apr 17, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 18, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Apr 12, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 8, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 8, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 8, 2026

Please see complaint number

BACTIVE
Apr 8, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 8, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 8, 2026

Please see complaint number

BACTIVE
Apr 7, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 7, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 7, 2026

No violation warranted for complaint at time of inspection

ACLOSED
Apr 7, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 7, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Apr 6, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 6, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 6, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Apr 5, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 5, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 4, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 3, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Apr 2, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Apr 3, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Mar 30, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 29, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 29, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 29, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 28, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 28, 2026
Boiler: Defective/Inoperative/No Permit
58
ACLOSED
Mar 27, 2026
Egress – Locked/Blocked/Improper/No Secondary Means
37
Closed Mar 29, 2026

No violation warranted for complaint at time of inspection

BACTIVE
Mar 27, 2026
Boiler: Defective/Inoperative/No Permit
58
Page 1 of 18
Next →