126 MIRAMAR AVE

Oceanview/Merced/Ingleside · San Francisco, CA · Parcel 6983028 · Last violation Aug 26, 2024 · Last complaint Dec 28, 2024

NeighborhoodOceanview/Merced/Ingleside
More violations than 99% of nearby buildings
More violations than 99% of buildings and more complaints than 97% of buildings in Oceanview/Merced/Ingleside. Size-normalized against residential buildings in the neighborhood.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 10 violations · 13 complaints
'22'24ViolationsComplaints
Severityⓘopen violations
6 open fire-safety violations
Active Notices of Violation issued by the Department of Building Inspection.
Open fire-safety violations6
Open lead violations0
311 Housing Complaints
Total complaints since 2022
29
6 per year avg.↓ Down 13% in the last 2 years (13 vs 15 prior 2 yrs)
Reported issues
13
Heatⓘ8
Leadⓘ1
Pestsⓘ2
Dept. of Building Inspection Violations
Total violations since 2022
72
14 per year avg.↓ Down 82% in the last 2 years (10 vs 55 prior 2 yrs)
Open violations
60
Fire safetyⓘ6
Leadⓘ0

Top violation categories

5 yrsAll time
building sectionⓘ28 violations
other sectionⓘ12 violations
plumbing and electrical sectionⓘ9 violations
fire sectionⓘ6 violations
interior surfaces sectionⓘ6 violations
smoke detection sectionⓘ4 violations
sanitation sectionⓘ3 violations
security requirements sectionⓘ3 violations
Unknownⓘ1 violations

Top complaint types

5 yrsAll time
Hot Water Lack Of Hot Water5 complaints
Doors Windows Broken Defective4 complaints
Electrical Hazardous Condition3 complaints
Heat Lack Of Heat3 complaints
Plumbing Broken Leaking2 complaints
Mold And Mildew2 complaints
Infestation Rodent Insect2 complaints
Deck Stairs Handrails2 complaints
Ventilation Inadequate Or None1 complaints
Electrical Non Hazard1 complaints
General Maintenance Not In List Above1 complaints
Illegal Construction No Permit Exceeds Permit Scope1 complaints
Paint Lead Violating Safe Practices1 complaints
Paint Peeling1 complaints
Hide violations (72) ↑See complaints (29) →

Violation log

72 DBI violations

AllOpenClosed
StatusFiledCategoryItemNOV Item Description
OpenFeb 8, 2023security requirements sectionmake necessary repairs to front bedroom.—
See something wrong? File a complaint with SF 311
OpenFeb 8, 2023building sectionmake the following necessary repairs/replacements at the ground floor bathroom and storgae area.—
OpenFeb 8, 2023fire sectionprovide missing cover plates on electrical switches and outlets. 504 & 1001(e) sfhcthe coverplates for the light switch and electrical outlets were missing in kitchen at time of inspection.
OpenFeb 8, 2023smoke detection sectionrepair or replace damaged interior door. 706 & 1001(b) sfhcmake necessary repairs/replacements to interior door off living room. at time of inspection, door was held together with packing tape.
OpenFeb 8, 2023interior surfaces sectionmake necessary repairs to rear exterior door.—
OpenFeb 8, 2023smoke detection sectionmake necessary repairs to living room.—
OpenFeb 8, 2023fire sectionmake necessary repairs to kitchen.—
OpenJan 6, 2023building sectionthis notice includes violations for the areas noted.126 miramar ave.
OpenJan 6, 2023other sectioninspector commentsdue to the violations noted, this constitutes a nuisance per the san francisco housing code section 1001(d) it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
OpenJan 6, 2023plumbing and electrical sectionprovide plumbing permit (103.1.1 pc)obtain applicable permit(s) for the installation of newer water heater and furnace at the basement/garage and have inspected and approved by the apppropriate inspection division.
not activeAug 17, 2022building sectionthis notice includes violations for the areas noted.126 miramar ave.
not activeAug 17, 2022interior surfaces sectionrepair damaged ceilings (1001b,h,o hc)repair hole at the pitched roof ceiling on the top floor room facing the street.
not activeAug 17, 2022other sectioninspector commentsdue to the violations noted, this constitutes a nuisance per the san francisco housing code section 1001(d) it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeAug 17, 2022building sectionbuilding permit required (301 hc)provide building permit and approval for the installation of new windows installed at various locations throughout the property.
not activeAug 17, 2022building sectionrepair window frame (1001(h),708 hc)repair broken and detached window framing at the window next to the entrance door and ensure that it functions properly. **note: if window is replaced, obtain building permit and approval.
not activeApr 19, 2022building sectionremove mold/mildew on the walls (401, 1301, 1001(d), 1306 hc)below the window at the front bedroom. check for water intrusion and repair as necessary.
not activeApr 19, 2022building sectionreplace damaged rain gutters (301,1001(b)(13) hc, 106 bc). note: applicable permit is required.at the rear of the building.
not activeApr 19, 2022building sectionreplace broken glass pane (1001(h)(2)hc)at the rear of the building.
not activeApr 19, 2022building sectioninspector commentit is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner can not attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeApr 19, 2022building sectiondisturbing lead based paint can be extremely dangerous to dwelling occupants and vistors, particularly to young children, pregnant women, pets, and to people performing work on the premises. for interior or exterior paint removal: always wet the surface, contain and properly dispose of lead-based paint. you can contact the san francisco childhood lead poisoning prevention program for advice for children under 6 years old. if you cause lead dust to be created, you could be liable for any illness caused by the dust. (sfebc 327).if the building is constructed prior to 1979, paint shall be presumed to be lead-based paint. any activities shall follow the work practice requirements of san francisco amendments existing building code section 327. any persons seeking to rebut this presumption shall establish their rebuttal through lead-based testing by a lead inspector/assessor certified by california department of public health prior to performing any work.if the paint is found to contain lead, you should consult with an expert about appropriate procedures. proper containment and notification requirements. informational packets are available at (628) 652-3700.
not activeApr 19, 2022building sectionrepair or replace the rear wooden stairway and deck (206, 301,802(c), 1001(b)(13), 1001(d) hc, 106, 1011, 1014, 1015 bc) note: building permit is required.—
not activeApr 19, 2022building sectionremove or cover damaged paint in an approved manner to prevent a lead hazard. see following lead hazard warning. (703, 1001(d), 1001(h)(3), 1301 hc).at the following areas: 1) front exterior of the building. 2) living room ceiling. 3) kitchen. 4) window sill at the rear of the building.
OpenFeb 8, 2023
security requirements section · make necessary repairs to front bedroom.
OpenFeb 8, 2023
building section · make the following necessary repairs/replacements at the ground floor bathroom and storgae area.
OpenFeb 8, 2023
fire section · provide missing cover plates on electrical switches and outlets. 504 & 1001(e) sfhc
the coverplates for the light switch and electrical outlets were missing in kitchen at time of inspection.
OpenFeb 8, 2023
smoke detection section · repair or replace damaged interior door. 706 & 1001(b) sfhc
make necessary repairs/replacements to interior door off living room. at time of inspection, door was held together with packing tape.
OpenFeb 8, 2023
interior surfaces section · make necessary repairs to rear exterior door.
OpenFeb 8, 2023
smoke detection section · make necessary repairs to living room.
OpenFeb 8, 2023
fire section · make necessary repairs to kitchen.
OpenJan 6, 2023
building section · this notice includes violations for the areas noted.
126 miramar ave.
OpenJan 6, 2023
other section · inspector comments
due to the violations noted, this constitutes a nuisance per the san francisco housing code section 1001(d) it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
OpenJan 6, 2023
plumbing and electrical section · provide plumbing permit (103.1.1 pc)
obtain applicable permit(s) for the installation of newer water heater and furnace at the basement/garage and have inspected and approved by the apppropriate inspection division.
not activeAug 17, 2022
building section · this notice includes violations for the areas noted.
126 miramar ave.
not activeAug 17, 2022
interior surfaces section · repair damaged ceilings (1001b,h,o hc)
repair hole at the pitched roof ceiling on the top floor room facing the street.
not activeAug 17, 2022
other section · inspector comments
due to the violations noted, this constitutes a nuisance per the san francisco housing code section 1001(d) it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeAug 17, 2022
building section · building permit required (301 hc)
provide building permit and approval for the installation of new windows installed at various locations throughout the property.
not activeAug 17, 2022
building section · repair window frame (1001(h),708 hc)
repair broken and detached window framing at the window next to the entrance door and ensure that it functions properly. **note: if window is replaced, obtain building permit and approval.
not activeApr 19, 2022
building section · remove mold/mildew on the walls (401, 1301, 1001(d), 1306 hc)
below the window at the front bedroom. check for water intrusion and repair as necessary.
not activeApr 19, 2022
building section · replace damaged rain gutters (301,1001(b)(13) hc, 106 bc). note: applicable permit is required.
at the rear of the building.
not activeApr 19, 2022
building section · replace broken glass pane (1001(h)(2)hc)
at the rear of the building.
not activeApr 19, 2022
building section · inspector comment
it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner can not attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeApr 19, 2022
building section · disturbing lead based paint can be extremely dangerous to dwelling occupants and vistors, particularly to young children, pregnant women, pets, and to people performing work on the premises. for interior or exterior paint removal: always wet the surface, contain and properly dispose of lead-based paint. you can contact the san francisco childhood lead poisoning prevention program for advice for children under 6 years old. if you cause lead dust to be created, you could be liable for any illness caused by the dust. (sfebc 327).
if the building is constructed prior to 1979, paint shall be presumed to be lead-based paint. any activities shall follow the work practice requirements of san francisco amendments existing building code section 327. any persons seeking to rebut this presumption shall establish their rebuttal through lead-based testing by a lead inspector/assessor certified by california department of public health prior to performing any work.if the paint is found to contain lead, you should consult with an expert about appropriate procedures. proper containment and notification requirements. informational packets are available at (628) 652-3700.
not activeApr 19, 2022
building section · repair or replace the rear wooden stairway and deck (206, 301,802(c), 1001(b)(13), 1001(d) hc, 106, 1011, 1014, 1015 bc) note: building permit is required.
not activeApr 19, 2022
building section · remove or cover damaged paint in an approved manner to prevent a lead hazard. see following lead hazard warning. (703, 1001(d), 1001(h)(3), 1301 hc).
at the following areas: 1) front exterior of the building. 2) living room ceiling. 3) kitchen. 4) window sill at the rear of the building.
Page 2 of 2