stoop
MAP
LeaderboardAbout

516 OFARRELL ST

Tenderloin · San Francisco, CA · Parcel 0318007 · Last violation Jun 16, 2026 · Last complaint Jul 17, 2026

NeighborhoodTenderloin
More violations than 94% of nearby buildings
More violations than 94% of buildings and more complaints than 97% of buildings in Tenderloin. Size-normalized against residential buildings in the neighborhood.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 44 violations · 59 complaints
'21'26ViolationsComplaints
Severityⓘopen violations
1 open fire-safety violation
Active Notices of Violation issued by the Department of Building Inspection.
Open fire-safety violations1
Open lead violations0
311 Housing Complaints
Total complaints since 2010
248
15 per year avg.↑ Up 59% in the last 2 years (59 vs 37 prior 2 yrs)
Complaint severity
Last 5 years
104
Severeⓘ29
Seriousⓘ53
Minorⓘ22
Dept. of Building Inspection Violations
Total violations since 1996
452
15 per year avg.↑ Up 47% in the last 2 years (44 vs 30 prior 2 yrs)
Open violations
13
Fire safetyⓘ1
Leadⓘ0

Top violation categories

5 yrsAll time
other sectionⓘ25 violations
building sectionⓘ21 violations
interior surfaces sectionⓘ12 violations
plumbing and electrical sectionⓘ12 violations
fire sectionⓘ3 violations
Unknownⓘ3 violations
sanitation section1 violations

Top complaint types

5 yrsAll time
General Maintenance Not In List Above14 complaints
Infestation Rodent Insect12 complaints
Elevators Everthing Else11 complaints
Plumbing Broken Leaking10 complaints
Mold And Mildew7 complaints
Bathroom7 complaints
Hot Water Lack Of Hot Water5 complaints
Electrical Non Hazard5 complaints
Elevators No Working Elevator 7 Or More Stories5 complaints
Fire Alarm System5 complaints
Heat Lack Of Heat4 complaints
Electrical Hazardous Condition4 complaints
Blocked Exit Common Areas3 complaints
Doors Windows Broken Defective2 complaints
Ventilation Inadequate Or None2 complaints
Fire Hazard2 complaints
Clutter Hoarder Unit Interior Storage1 complaints
Security Inadequately Secured Perimeter1 complaints
Smoke Detectors Missing Broken Unit Interior1 complaints
Visitor Policy Violations1 complaints
Infestation Bed Bugs1 complaints
Kitchen Community1 complaints
Mail Service Delivery Problem1 complaints
Hide violations (452) ↑See complaints (248) →

Violation log

439 DBI violations · Closed

AllOpenClosed
StatusFiledCategoryItemNOV Item Description
not activeFeb 18, 2009plumbing and electrical sectionmake necessary repairs to tub/shower (1001 hc)sections of the tub are missing its enamel finish. replace the tub or reglaze the damaged sections.
See something wrong? File a complaint with SF 311
not activeFeb 18, 2009plumbing and electrical sectionrepair toilet (1001f hc)the toilet isn't fasteneed to the floor. fasten the toilet.
not activeFeb 18, 2009building sectioninspectors commentsall violations cited are in #421.
not activeFeb 18, 2009plumbing and electrical sectionrepair electrical outlet (1001e hc)replace the following: 1) worn/damaged bathroom electrical outlet; 2) broken outlet cover plate in the bedroom.
not activeFeb 18, 2009other sectioninspector commentsit is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeFeb 18, 2009interior surfaces sectionpaint ceilings & walls (1001b,1301 hc)prep and paint: 1) the peeling damaged paint in the bath; 2) all repaired surfaces.
not activeFeb 18, 2009interior surfaces sectiondisturbing lead based paint can be extremely dangerous to dwelling occupants and visitors, particularly to young children, pregnant women, pets, and to people performing work on the premises. for interior or exterior paint removal : always wet the surface, contain and properly dispose of leaded paint. if you are unsure whether the paint is leaded, you should test it prior to performing any work. if the paint is found to contain lead, you should consult with an expert about appropriate procedures. proper containment and 3-day notification is required for exterior jobs of more than 10 sq.ft. (sec.3604, sfbc) informational packets are available at (415) 558-6088. you can contact the san francisco childhood lead poisoning prevention program at: (415) 554-8930 for free advice. if you cause lead dust to be created, you could be liable for any illness caused by the dust. ordinance #446-97.—
not activeFeb 18, 2009interior surfaces sectionrepair damaged walls (1001b,h hc)repair the holes in the bedroom walls.
not activeJan 21, 2009other sectionrepair defective or non-working elevator (1001(l), 713 hc)make the needed repairs to return the elevator to full service.
not activeJan 21, 2009other sectioninspector commentsit is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeNov 3, 2008other sectionit is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection time/date with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b)), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.—
not activeNov 3, 2008other sectionprovide residential hotel mail receptacles (1002(e))—
not activeAug 6, 2007———
not activeAug 6, 2007———
not activeAug 16, 2006other sectioninspector commentsit is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeAug 16, 2006other sectionprovide heat to each occupied habitable room for 13 hrs between 5:00 a.m. and 11:00 a.m. and between 3:00 p.m. and 10:00 p.m. capable to maintaining a min. room temp. of 68 degrees f. (20 degrees c.). (701c hc)at the time of inspection the boilers burners would not light. have a licensed boiler maintenace company make the needed repairs.
not activeAug 16, 2006other sectionpost the current boiler certification (1001 hc)at the time of inspection the posted boiler certification was out of date. have the boiler inspected and post the current boiler certification.
not activeAug 16, 2006other sectioninspector commentsnote: on reinspection day, property manager, owner or the owner's agent needs to demonstrate the workability of the fire escape ladders. the fire escapes are to be checked on all buildings during the course of a routine inspection. non-working fire escape ladder is a life safety hazard and must be corrected immediately. provide a written and signed report from a qualified service company or contractor stating that all parts and cables have been tested and are functional or you are required to lower the ladder on re-inspection day to verify its proper full release. reminder: test and verify that all windows or doors leading to emergency fire escape are operational and unobstructed. advise occupants not to block the path of emergency exits on the inside. **reminder**all manufacturers recommend that the fire escape drop ladder be maintained and serviced annually, particularly the cable and all moving parts. lubricate and drop the ladder at least once a year.
not activeAug 16, 2006fire sectionrecharge/date tag fire extinguisher type 2a 10bc or equivalent (905,1001(m)hc)the certification for the fire extinguisher in the basement opposite the boiler room entrance door is out of date. have the extinguisher recharged and retagged.
not activeAug 16, 2006smoke detection sectionprovide smoke detector at stairs (911 hc)provide a smoke alarm at the top of the main stairs at the roof penthouse. this can be a battery operated smoke alarm.
not activeFeb 16, 2006building sectionrepair,service malfunctioning heating system.1001hc./701hc.1)install a radiator valve handle in gr#509,522. 2)repair/service leaking radiator units in gr#317,404.1001hc./701hc.
not activeFeb 16, 2006building sectionrepalster and paint common east facing bathrooms and restrooms throughout the premises.1)replace all mechanical ventilation fans and assemblies in common east facing bathrooms on all floors. 2)replaster and paint walls and ceiling surfaces of commona bathrooms and restrooms facing jones st.1001hc./1301hc.
not activeFeb 16, 2006building section1)repair/replace broken window.1001hc. 2)replace damaged broken door frame.1001jc.1)repair/replace broken window in gr#224.1001hc. 2)replace missing sash cords to guestroom windows in gr#505,509.1001hc.
not activeFeb 16, 2006building sectionrepair defective plumbing.1001hc.1)unstop toilet in gr#525,603.1001hc. 2)repair leaking bathroom faucet in gr#317,402,608.1001hc. 3)replace leaking defective p trap under bathroom sink in gr#310.1001hc. 4)replace bathroom sink in gr#316.1001hc.
not activeFeb 16, 2006building sectionprovide adequate bathroom ventilation to all private bathrooms lacking same.hire the services of a mechanical engineer and a licensed contractor in order to provide a requiered mechanical capable to provide 5 air changes per hour.sec.504 (c) h.c.
not activeFeb 16, 2006building sectionintensify pest control service until bed bug,roaches and mice infestation is under control.1001extensive bed bugs reported by occupants of gr#417,512,603,609.
not activeFeb 16, 2006building sectionreplace damaged door jamb and substandard framing.1001hc.1)replace damaged door jamb and substandard framing to entry door in gr#210,422,520.1001hc. 2)install a 138 degrees viewer to entry door in gr#301,411.1001hc./706hc. 30replace damaged entry door to gr#520,with a solid core type.1001hc./706hc.
not activeFeb 16, 2006building sectionremove,contain and properly dispose of peeling paint and plaster at various locations.replaster and paint walls and ceiling surfaces in the following grs#: a)204,208,216,224,306,307,311,316,317,318,414,415,417,419,425,427,521.1001hc./1031hc. b)replaster and paint damaged ,peeling bathroom walls and ceiling surfaces in grs#: 309,419,509,521,525.1001hc. c)replaster and paint
not activeFeb 16, 2006building sectionreplace soiled worn,insanitary guestroom carpeting at various locations.1001hc./1306hc.1)replace soiled,worn,insanitray guestroom carpeting,floor covering in the following locations: gr#204,224,304,305,311,316,317,402,427,511,521.1306hc. 2)clean and shampoo soiled carpeting in: gr#210,224,304,306,405,415,5112,521.1001hc./1306hc. 3)resurface bathroom floor surfaces in gr#:307,419.1001hc.
not activeJul 11, 2005interior surfaces section#510—
not activeJul 11, 2005interior surfaces sectionopening gap at bottom of walls ( 1001 hc)close off all opening gap at bottom of walls by vinyl base, wooden base or approved equal.
not activeMay 24, 2005other sectionprovide apt. house or hotel water heated to min. 105 degrees f. (41 degrees c.) and max. of 120 degrees f. (49 degrees c.) at hot water taps. (505d(3))water temperature in room 516 was 134 degrees at time of inspection. lower water temperature to 120 degrees; inspector recommends installation of a combination faucet for basin.
not activeApr 18, 2005smoke detection sectionrepair smoke detector (908 911 hc)tenant reports that smoke detector does not work. please check smoke detector for proper operation and demonstrate its operation upon reinspection.
not activeApr 18, 2005interior surfaces sectionrepair damaged walls (1001b,h,o hc)seal hole around sprinkler head in closet, room 510.
not activeApr 18, 2005interior surfaces sectionrepair damaged walls (1001b,h,o hc)fill holes at bottom portion of walls in room 510.
not activeApr 18, 2005building sectionprovide ventilation for bathroom, room 510 (sf housing code section 504)install mechanical ventilation for bathroo, which will provide 5 air changes per hour. a minimum of 15 cubic feet per occupant of the air supply shall be taken from the outside. the point of discharge of exhaust air shall be at least three feet from any opening into the building.
not activeApr 18, 2005interior surfaces sectionpaint walls (1001b,1301 hc)paint portion of wall that has been repaired in room 510.
not activeApr 18, 2005building sectionbuilding permit required (301 hc)for installation of mechanical fan.
not activeApr 18, 2005fire sectionrecharge all fire extinguishers (905, 1001(m) hc)—
not activeApr 18, 2005security requirements sectionother security violationstenant reports that doorknob is loose and screw is missing; check doorknob and replace screw as necessary, room 510.
not activeJul 22, 2004building sectionpaint walls and ceiling surfaces of the public bathrooms/tub rooms on each floor.1301hc.public bathrooms in need to be painted.
not activeJul 22, 2004building section1)remove lint,clean and sanitize areas around ,under,behind laundry machines. 2)remove lint from overhead pipes in the basement/laundry room areas. 3)discard excessive storage,clean and sanitize laundry room area.1306hc.laundry room,storage areas in need to be cleaned.
not activeJul 22, 2004building section1)provide adequate ventilation to all tub rooms. 2)install mechanical ventilation devices capable to exchange 5 air changes per hour,to each public bathroom.504hc.lack of requiered ventilation to public bathrooms.
not activeAug 8, 2003building sectionleaking hot water faucet.repair leaking hot water faucet in hand wash basing gr#414.1001hc.
not activeAug 8, 2003building sectionflaking paint along wall surfaces above bed area.replaster and paint damaged wall surfaces in gr#414.1301hc.
not activeAug 8, 2003building sectioninoperative ,disconnected hard wire smoke detector.replace or repair inoperative smoke detector unit.908hc.
not activeAug 8, 2003building sectionuse of any form of cooking equipment in guestrooms are prohibited.discontinue use of cooking equipment in gr#414,constituting a potential fire hazard,overloading electrical circuits. sec 709hc.
not activeAug 8, 2003building sectioncarpeting is filled with burnt marks.replace burnt,soiled carpeting in gr#414.1306hc.
not activeApr 25, 2003building sectiondamaged,peeling paint throughout gr#5171) remove,properly contain peeling paint and plaster from walls and ceiling surfaces in gr#517.1001hc./1301hc. 2)paint premises throughout.1301hc.
not activeApr 25, 2003building sectionoverhead leaks causing ceiling damage in bathroom area above shower head.1)asses cause and repair overhead leaks causing ceiling damage in bathroom of gr#517.1001hc. 2)replaster and paint affected bathroom ceiling surfaces.1301hc.
not activeFeb 18, 2009
plumbing and electrical section · make necessary repairs to tub/shower (1001 hc)
sections of the tub are missing its enamel finish. replace the tub or reglaze the damaged sections.
not activeFeb 18, 2009
plumbing and electrical section · repair toilet (1001f hc)
the toilet isn't fasteneed to the floor. fasten the toilet.
not activeFeb 18, 2009
building section · inspectors comments
all violations cited are in #421.
not activeFeb 18, 2009
plumbing and electrical section · repair electrical outlet (1001e hc)
replace the following: 1) worn/damaged bathroom electrical outlet; 2) broken outlet cover plate in the bedroom.
not activeFeb 18, 2009
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeFeb 18, 2009
interior surfaces section · paint ceilings & walls (1001b,1301 hc)
prep and paint: 1) the peeling damaged paint in the bath; 2) all repaired surfaces.
not activeFeb 18, 2009
interior surfaces section · disturbing lead based paint can be extremely dangerous to dwelling occupants and visitors, particularly to young children, pregnant women, pets, and to people performing work on the premises. for interior or exterior paint removal : always wet the surface, contain and properly dispose of leaded paint. if you are unsure whether the paint is leaded, you should test it prior to performing any work. if the paint is found to contain lead, you should consult with an expert about appropriate procedures. proper containment and 3-day notification is required for exterior jobs of more than 10 sq.ft. (sec.3604, sfbc) informational packets are available at (415) 558-6088. you can contact the san francisco childhood lead poisoning prevention program at: (415) 554-8930 for free advice. if you cause lead dust to be created, you could be liable for any illness caused by the dust. ordinance #446-97.
not activeFeb 18, 2009
interior surfaces section · repair damaged walls (1001b,h hc)
repair the holes in the bedroom walls.
not activeJan 21, 2009
other section · repair defective or non-working elevator (1001(l), 713 hc)
make the needed repairs to return the elevator to full service.
not activeJan 21, 2009
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeNov 3, 2008
other section · it is the property owner's responsibility to be present or direct his/her representative to attend the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection time/date with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b)), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeNov 3, 2008
other section · provide residential hotel mail receptacles (1002(e))
not activeAug 6, 2007
—
not activeAug 6, 2007
—
not activeAug 16, 2006
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend, the reinspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the reinspection.
not activeAug 16, 2006
other section · provide heat to each occupied habitable room for 13 hrs between 5:00 a.m. and 11:00 a.m. and between 3:00 p.m. and 10:00 p.m. capable to maintaining a min. room temp. of 68 degrees f. (20 degrees c.). (701c hc)
at the time of inspection the boilers burners would not light. have a licensed boiler maintenace company make the needed repairs.
not activeAug 16, 2006
other section · post the current boiler certification (1001 hc)
at the time of inspection the posted boiler certification was out of date. have the boiler inspected and post the current boiler certification.
not activeAug 16, 2006
other section · inspector comments
note: on reinspection day, property manager, owner or the owner's agent needs to demonstrate the workability of the fire escape ladders. the fire escapes are to be checked on all buildings during the course of a routine inspection. non-working fire escape ladder is a life safety hazard and must be corrected immediately. provide a written and signed report from a qualified service company or contractor stating that all parts and cables have been tested and are functional or you are required to lower the ladder on re-inspection day to verify its proper full release. reminder: test and verify that all windows or doors leading to emergency fire escape are operational and unobstructed. advise occupants not to block the path of emergency exits on the inside. **reminder**all manufacturers recommend that the fire escape drop ladder be maintained and serviced annually, particularly the cable and all moving parts. lubricate and drop the ladder at least once a year.
not activeAug 16, 2006
fire section · recharge/date tag fire extinguisher type 2a 10bc or equivalent (905,1001(m)hc)
the certification for the fire extinguisher in the basement opposite the boiler room entrance door is out of date. have the extinguisher recharged and retagged.
not activeAug 16, 2006
smoke detection section · provide smoke detector at stairs (911 hc)
provide a smoke alarm at the top of the main stairs at the roof penthouse. this can be a battery operated smoke alarm.
not activeFeb 16, 2006
building section · repair,service malfunctioning heating system.1001hc./701hc.
1)install a radiator valve handle in gr#509,522. 2)repair/service leaking radiator units in gr#317,404.1001hc./701hc.
not activeFeb 16, 2006
building section · repalster and paint common east facing bathrooms and restrooms throughout the premises.
1)replace all mechanical ventilation fans and assemblies in common east facing bathrooms on all floors. 2)replaster and paint walls and ceiling surfaces of commona bathrooms and restrooms facing jones st.1001hc./1301hc.
not activeFeb 16, 2006
building section · 1)repair/replace broken window.1001hc. 2)replace damaged broken door frame.1001jc.
1)repair/replace broken window in gr#224.1001hc. 2)replace missing sash cords to guestroom windows in gr#505,509.1001hc.
not activeFeb 16, 2006
building section · repair defective plumbing.1001hc.
1)unstop toilet in gr#525,603.1001hc. 2)repair leaking bathroom faucet in gr#317,402,608.1001hc. 3)replace leaking defective p trap under bathroom sink in gr#310.1001hc. 4)replace bathroom sink in gr#316.1001hc.
not activeFeb 16, 2006
building section · provide adequate bathroom ventilation to all private bathrooms lacking same.
hire the services of a mechanical engineer and a licensed contractor in order to provide a requiered mechanical capable to provide 5 air changes per hour.sec.504 (c) h.c.
not activeFeb 16, 2006
building section · intensify pest control service until bed bug,roaches and mice infestation is under control.1001
extensive bed bugs reported by occupants of gr#417,512,603,609.
not activeFeb 16, 2006
building section · replace damaged door jamb and substandard framing.1001hc.
1)replace damaged door jamb and substandard framing to entry door in gr#210,422,520.1001hc. 2)install a 138 degrees viewer to entry door in gr#301,411.1001hc./706hc. 30replace damaged entry door to gr#520,with a solid core type.1001hc./706hc.
not activeFeb 16, 2006
building section · remove,contain and properly dispose of peeling paint and plaster at various locations.
replaster and paint walls and ceiling surfaces in the following grs#: a)204,208,216,224,306,307,311,316,317,318,414,415,417,419,425,427,521.1001hc./1031hc. b)replaster and paint damaged ,peeling bathroom walls and ceiling surfaces in grs#: 309,419,509,521,525.1001hc. c)replaster and paint
not activeFeb 16, 2006
building section · replace soiled worn,insanitary guestroom carpeting at various locations.1001hc./1306hc.
1)replace soiled,worn,insanitray guestroom carpeting,floor covering in the following locations: gr#204,224,304,305,311,316,317,402,427,511,521.1306hc. 2)clean and shampoo soiled carpeting in: gr#210,224,304,306,405,415,5112,521.1001hc./1306hc. 3)resurface bathroom floor surfaces in gr#:307,419.1001hc.
not activeJul 11, 2005
interior surfaces section · #510
not activeJul 11, 2005
interior surfaces section · opening gap at bottom of walls ( 1001 hc)
close off all opening gap at bottom of walls by vinyl base, wooden base or approved equal.
not activeMay 24, 2005
other section · provide apt. house or hotel water heated to min. 105 degrees f. (41 degrees c.) and max. of 120 degrees f. (49 degrees c.) at hot water taps. (505d(3))
water temperature in room 516 was 134 degrees at time of inspection. lower water temperature to 120 degrees; inspector recommends installation of a combination faucet for basin.
not activeApr 18, 2005
smoke detection section · repair smoke detector (908 911 hc)
tenant reports that smoke detector does not work. please check smoke detector for proper operation and demonstrate its operation upon reinspection.
not activeApr 18, 2005
interior surfaces section · repair damaged walls (1001b,h,o hc)
seal hole around sprinkler head in closet, room 510.
not activeApr 18, 2005
interior surfaces section · repair damaged walls (1001b,h,o hc)
fill holes at bottom portion of walls in room 510.
not activeApr 18, 2005
building section · provide ventilation for bathroom, room 510 (sf housing code section 504)
install mechanical ventilation for bathroo, which will provide 5 air changes per hour. a minimum of 15 cubic feet per occupant of the air supply shall be taken from the outside. the point of discharge of exhaust air shall be at least three feet from any opening into the building.
not activeApr 18, 2005
interior surfaces section · paint walls (1001b,1301 hc)
paint portion of wall that has been repaired in room 510.
not activeApr 18, 2005
building section · building permit required (301 hc)
for installation of mechanical fan.
not activeApr 18, 2005
fire section · recharge all fire extinguishers (905, 1001(m) hc)
not activeApr 18, 2005
security requirements section · other security violations
tenant reports that doorknob is loose and screw is missing; check doorknob and replace screw as necessary, room 510.
not activeJul 22, 2004
building section · paint walls and ceiling surfaces of the public bathrooms/tub rooms on each floor.1301hc.
public bathrooms in need to be painted.
not activeJul 22, 2004
building section · 1)remove lint,clean and sanitize areas around ,under,behind laundry machines. 2)remove lint from overhead pipes in the basement/laundry room areas. 3)discard excessive storage,clean and sanitize laundry room area.1306hc.
laundry room,storage areas in need to be cleaned.
not activeJul 22, 2004
building section · 1)provide adequate ventilation to all tub rooms. 2)install mechanical ventilation devices capable to exchange 5 air changes per hour,to each public bathroom.504hc.
lack of requiered ventilation to public bathrooms.
not activeAug 8, 2003
building section · leaking hot water faucet.
repair leaking hot water faucet in hand wash basing gr#414.1001hc.
not activeAug 8, 2003
building section · flaking paint along wall surfaces above bed area.
replaster and paint damaged wall surfaces in gr#414.1301hc.
not activeAug 8, 2003
building section · inoperative ,disconnected hard wire smoke detector.
replace or repair inoperative smoke detector unit.908hc.
not activeAug 8, 2003
building section · use of any form of cooking equipment in guestrooms are prohibited.
discontinue use of cooking equipment in gr#414,constituting a potential fire hazard,overloading electrical circuits. sec 709hc.
not activeAug 8, 2003
building section · carpeting is filled with burnt marks.
replace burnt,soiled carpeting in gr#414.1306hc.
not activeApr 25, 2003
building section · damaged,peeling paint throughout gr#517
1) remove,properly contain peeling paint and plaster from walls and ceiling surfaces in gr#517.1001hc./1301hc. 2)paint premises throughout.1301hc.
not activeApr 25, 2003
building section · overhead leaks causing ceiling damage in bathroom area above shower head.
1)asses cause and repair overhead leaks causing ceiling damage in bathroom of gr#517.1001hc. 2)replaster and paint affected bathroom ceiling surfaces.1301hc.
Page 8 of 9
← PrevNext →