OpenJan 9, 2026
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection. ***correction of violations cited in this notice may require building, plumbing and/or electrical permits. it is the responsibility of the owner to obtain (or have others obtain) any required permits before beginning work that requires permit(s). when applying for a permit, reference the complaint number from this notice of violation. you must have the proper permit signed-off and finalized before the housing insp. returns in order for this violation to be abated.***
OpenJan 9, 2026
interior surfaces section · repair damaged ceiling (1001(b),(h),(o) hc)
repair damaged ceiling above bathtub in an approved manner; at time of inspection, plastic tarp covering hole in ceiling. location: bathroom ----------
OpenJan 9, 2026
building section · this notice includes violations for the areas noted.
subject property located at 516 o'farrell st. unit #307.
OpenMay 23, 2025
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
OpenMay 23, 2025
building section · this notice includes violations for the areas noted.
subject property located at 516 o'farrell st. unit #526.
OpenMay 23, 2025
interior surfaces section · repair damaged walls (1001(b),(h),(o) hc)
repair damaged walls in an approved manner; observed cracked/ loose plaster and paint at time of inspection; re-paint all affected areas after completed repairs. location: unit #526 ----------
OpenMar 5, 2025
fire section · replace fire extinguisher (905, 1001(m) hc)
replace missing fire extinguisher. location: 4th fl. common area hallway (near units #414 & #409) ----------
OpenMar 5, 2025
building section · this notice includes violations for the areas noted.
subject property located at 516 o'farrell st. unit #414 and 4th fl. common areas.
OpenMar 5, 2025
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
OpenMar 5, 2025
interior surfaces section · repair damaged wall (1001(b),(h),(o) hc)
repair damaged wall behind bedframe; several holes in wall observed. location: unit #414 ----------
OpenMar 5, 2025
plumbing and electrical section · repair sink (1001(f) hc)
enamel in sink is worn; reglaze to like-new condition or replace. location: sink ----------
OpenMar 5, 2025
interior surfaces section · repair damaged ceilings & walls (1001(b),(h),(o) hc)
evidence of peeling/ cracked, bubbling and flaking paint observed; remove/ cover peeling or damaged paint in an approved manner where peeling or damaged paint exists; prime and re-paint all affected areas. location: 4th fl. common area hallway (near/ above unit #414; near units #420 & #421) note: it is the owner's responsibility to investigate for possible presence of lead-based paint and remove, following procedures set forth by the san francisco health and building departments. consult with a qualified lead abatement contractor as required. disturbing lead based paint can be extremely dangerous to dwelling occupants and visitors, particularly to young children, pregnant women, pets, and to people performing work on the premises. for interior or exterior paint removal: always wet the surface, contain and properly dispose of leaded paint. if you are unsure whether the paint is leaded, you should test it prior to performing any work. if the paint is found to contain lead, you should consult with an expert about appropriate procedures. proper containment and 3-day notification is required for exterior jobs of more than 10 sq.ft. (sec.3423, sfbc) informational packets are available at (628) 652-3700. you can contact the san francisco childhood lead poisoning prevention program at: (415) 252-3800 for free advice. if you cause lead dust to be created, you could be liable for any illness caused by the dust. ordinance #446-97. ----------