OpenMay 5, 2026
interior surfaces section · repair source of water damage (703,1001f hc)
at time of inspection, active leak was observed in the basement area of the building. locate and repair source of water damage in an approved manner. at time of reinspection provide written proof of work done by certified professional to determine source of leak and repair done to prevent further leakage and water damage.
OpenMay 5, 2026
building section · this notice includes violations for the areas noted.
926 larkin street unit#5 and all common area
OpenMay 5, 2026
fire section · repair smoke enclosure door closer (807,707 hc)
at time of inspection, exit door to building rooftop did not fully self close and self lock. this exit door is required to be in good condition, tightfitting, self closing, self latching and self locking.
OpenMay 5, 2026
other section · inspector comments
it is the property owner's responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled reinspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector. provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection. you can reach inspector lee @ 415-793-7947 or by email at joy.lee@sfgov.org.
OpenMay 5, 2026
interior surfaces section · repair damaged ceilings (1001b,h,o hc)
at time of inspection, leak damage was observed in the basement area of the building. repair and repaint the damaged areas in an approved manner.
OpenMay 5, 2026
building section · general dilapidation or improper maintenance (1001 (b)(13))
at time of inspection, damages were observed on unit#5 main entrance door frame and hardwares. repair or replace all damaged areas in an approved manner.