stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

85 HOLLAND AVENUE

Staten Island · ZIP 10303 · BIN 5109139 · Mariner's Harbor-Arlington-Graniteville · Last violation Jul 30, 2026 · Last complaint Jul 22, 2026

NeighborhoodMariner's Harbor-Arlington-Graniteville
More violations than 92% of nearby buildings
More violations than 92% of buildings and more complaints than 89% of buildings in Mariner's Harbor-Arlington-Graniteville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 220 violations · 109 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
23 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous23Class Bhazardous31
Housing Preservation & Development Violations
Total violations since 1987
1,364
34 per year avg.↓ Down 22% in the last 2 years (220 vs 282 prior 2 yrs)
Open violations
65
Class C (immed. haz.)ⓘ23
Class B (hazardous)ⓘ31
Rent-impairingⓘ2
Housing Preservation & Development Complaints
Total complaints since 2003
1,352
56 per year avg.↓ Down 10% in the last 2 years (109 vs 121 prior 2 yrs)
Complaint Resolution
No access13%Violation issued24%No violation36%Phone resolved27%Other0%(1,352)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ219 violations
Paintingⓘ79 violations
Egressⓘ74 violations
Water Supplyⓘ51 violations
Cleaningⓘ49 violations
Carbon Monoxide Detecting Devicesⓘ34 violations
Sewers And Drainageⓘ34 violations
Smoke Detecting Devicesⓘ33 violations
Top complaint groupsⓘ
5 yrsAll time
Water & plumbingⓘ80 complaints
Heat / hot waterⓘ72 complaints
Mold & pestsⓘ57 complaints
Bldg maintenanceⓘ54 complaints
Appliancesⓘ15 complaints
Safety & fireⓘ8 complaints
Electricalⓘ5 complaints
Hide violations ↑See complaints →

Violation log

480 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days43% (28)
▪ 30–90 days31% (20)
▪ 3–12 months5% (3)
▪ 1–3 years12% (8)
▪ 3+ years9% (6)
Prior 4 yr.
Immed. Emergency0%2%
Emergency65%61%
Non-Emergency35%37%
(49)
(276)
Issued
Description
Class AClosed11CApr 28, 2015REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st CLOSET FROM WEST AT NORTH WALL WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11C, 11th STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed—Apr 28, 2015POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
Class AClosed13EJan 9, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 13E, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2KSep 10, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WEST WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed2DSep 10, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH & WEST WALLS IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed11MAug 13, 2014REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR AT NORTH BASE CABINET IN THE KITCHEN LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed11MAug 13, 2014REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOB AT THE BALCONY DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed11MAug 13, 2014REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR AT NORTH CLOSET CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed10DJun 9, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 10D, 10th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed13DMay 8, 2014REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed13DMay 8, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed4BMay 21, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed7HJan 10, 2013REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR TO TERRACE LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed7HJan 10, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed—Dec 26, 2012IV-1. MAILBOXES PRESENT · POSTING/SIGNAGE§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .. AT PUBLIC HALL, 1st STORY
Class AClosed11EDec 26, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 11E, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed12HOct 12, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed12HOct 12, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed12HOct 12, 2012RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed13DFeb 8, 2008PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed11AMay 24, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & ALL WALLS IN THE BATHROOM LOCATED AT APT 11A, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed11KJan 5, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed11KJan 5, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING IN THE BATHROOM LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed11KJan 5, 2006PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed11KJan 5, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL IN THE FOYER LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed11KJan 5, 2006PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed11KJan 5, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , BASEBOARD AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed12KJan 31, 2005PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL IN THE KITCHEN LOCATED AT APT 12K, APARTMENT AT NORTH
Class AClosed6EJul 12, 2001REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 6E, 7th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed7-HJan 19, 2001PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING ( BLDG BUILT 1979 - NO LEAD ) IN THE BATHROOM LOCATED AT APT 7-H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 28, 2015Apt 11C
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st CLOSET FROM WEST AT NORTH WALL WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11C, 11th STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 28, 2015
POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
Class AClosed
Jan 9, 2015Apt 13E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 13E, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Sep 10, 2014Apt 2K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WEST WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed
Sep 10, 2014Apt 2D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH & WEST WALLS IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 13, 2014Apt 11M
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT DOOR AT NORTH BASE CABINET IN THE KITCHEN LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 13, 2014Apt 11M
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOB AT THE BALCONY DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 13, 2014Apt 11M
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT DOOR AT NORTH CLOSET CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 11M, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Jun 9, 2014Apt 10D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 10D, 10th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
May 8, 2014Apt 13D
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
May 8, 2014Apt 13D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
May 21, 2013Apt 4B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed
Jan 10, 2013Apt 7H
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT ENTRANCE DOOR TO TERRACE LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 10, 2013Apt 7H
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Dec 26, 2012
IV-1. MAILBOXES PRESENT · POSTING/SIGNAGE
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .. AT PUBLIC HALL, 1st STORY
Class AClosed
Dec 26, 2012Apt 11E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 11E, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Oct 12, 2012Apt 12H
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Oct 12, 2012Apt 12H
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Oct 12, 2012Apt 12H
RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Feb 8, 2008Apt 13D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 13D, 13th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
May 24, 2006Apt 11A
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & ALL WALLS IN THE BATHROOM LOCATED AT APT 11A, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING IN THE BATHROOM LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL IN THE FOYER LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 5, 2006Apt 11K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , BASEBOARD AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 31, 2005Apt 12K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL IN THE KITCHEN LOCATED AT APT 12K, APARTMENT AT NORTH
Class AClosed
Jul 12, 2001Apt 6E
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 6E, 7th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Jan 19, 2001Apt 7-H
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING ( BLDG BUILT 1979 - NO LEAD ) IN THE BATHROOM LOCATED AT APT 7-H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Page 10 of 10
← Prev