stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

180 LENOX ROAD

Brooklyn · ZIP 11226 · BIN 3116652 · East Flatbush-Erasmus · Last violation Jun 10, 2026 · Last complaint Jun 9, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 93.4% of nearby buildings
More violations than 93% of buildings and more complaints than 94% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 549 violations · 447 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
45 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous45Class Bhazardous69
Housing Preservation & Development Violations
Total violations since 2004
1,864
81 per year avg.↑ Up 63% in the last 2 years (549 vs 336 prior 2 yrs)
Open violations
140
Class C (immed. haz.)ⓘ45
Class B (hazardous)ⓘ69
Rent-impairingⓘ8
Housing Preservation & Development Complaints
Total complaints since 2003
2,718
113 per year avg.↑ Up 71% in the last 2 years (447 vs 262 prior 2 yrs)
Complaint Resolution
No access18%Violation issued22%No violation29%Phone resolved30%Other0%(2,718)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ426 violations
Water Supplyⓘ132 violations
Egressⓘ114 violations
Cleaningⓘ75 violations
Paintingⓘ72 violations
Extermination & Rodent Eradicationⓘ68 violations
Heat And Hot Waterⓘ49 violations
Carbon Monoxide Detecting Devicesⓘ29 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ224 complaints
Water & plumbingⓘ193 complaints
Mold & pestsⓘ119 complaints
Bldg maintenanceⓘ97 complaints
Electricalⓘ52 complaints
Appliancesⓘ12 complaints
Safety & fireⓘ5 complaints
Outdoor / structuralⓘ2 complaints
Adminⓘ2 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

367 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days1% (1)
▪ 30–90 days44% (61)
▪ 3–12 months32% (45)
▪ 1–3 years4% (5)
▪ 3+ years20% (28)
Prior 4 yr.
Immed. Emergency9%6%
Emergency67%48%
Non-Emergency25%46%
(244)
(576)
Issued
Description
Class AClosed2EDec 22, 2014REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FAUCET KNOB AT WASHBASIN. IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed2BAug 18, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed2BAug 18, 2014PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed6KMar 31, 2014REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed1JOct 30, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WALLS IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed2MFeb 13, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE KITCHEN LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL, EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed2MAug 20, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed1EMar 28, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE DOORS AND ALL TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2MJan 12, 2009PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AOpen4LApr 15, 2008FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ERECTING WALL CREATING 2 ROOMS IN THE 5th ROOM FROM NORTH LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed2MMay 15, 2007PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE BATHROOM , THE FOYER LOCATED AT APT 2M, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AOpen6MOct 25, 2004FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL DIVIDING LIVINGROOM IN TWO ROOMS IN THE 2nd LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Dec 22, 2014Apt 2E
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FAUCET KNOB AT WASHBASIN. IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Aug 18, 2014Apt 2B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed
Aug 18, 2014Apt 2B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed
Mar 31, 2014Apt 6K
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Oct 30, 2013Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WALLS IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Feb 13, 2013Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE KITCHEN LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL, EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Aug 20, 2012Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed
Mar 28, 2012Apt 1E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE DOORS AND ALL TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Jan 12, 2009Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2M, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AOpen
Apr 15, 2008Apt 4L
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ERECTING WALL CREATING 2 ROOMS IN THE 5th ROOM FROM NORTH LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
May 15, 2007Apt 2M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE BATHROOM , THE FOYER LOCATED AT APT 2M, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AOpen
Oct 25, 2004Apt 6M
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL DIVIDING LIVINGROOM IN TWO ROOMS IN THE 2nd LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Page 8 of 8
← Prev