Class AClosed
Sep 17, 2021Apt D4
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT D4, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Aug 16, 2021Apt F1
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT THE DOOR AT SOUTH WALL CABINET IN THE KITCHENETTE LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Aug 16, 2021Apt F1
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Aug 16, 2021Apt F1
RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT LOWER REFRIGERATOR DOOR IN THE KITCHENETTE LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Aug 16, 2021Apt F1
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE WALL TILES AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Aug 3, 2021Apt L1
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST, THE 1st ROOM FROM EAST, THE KITCHEN , THE BATHROOM LOCATED AT APT L1, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed
Jul 16, 2021Apt D6
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET TO REFRIGERATOR IN THE KITCHEN LOCATED AT APT D6, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed
Jul 16, 2021Apt B4
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE KITCHEN LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed
Jul 16, 2021Apt D6
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE TO FLOOR CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT D6, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed
Jul 15, 2021Apt M5
NO PEEP HOLE · PROTECTIVE DEVICES AND FIRE PROTECTION
§ 27-2041 ADM CODE PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED SO AS TO PERMIT A PERSON INSIDE THE DWELLING TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Jul 14, 2021Apt G6
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEATING RISER PIPE IN THE KITCHEN LOCATED AT APT G6, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Jul 14, 2021Apt G6
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT G6, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Jul 14, 2021Apt G6
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEATING RISER PIPE IN THE BATHROOM LOCATED AT APT G6, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Jul 2, 2021Apt D2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Jul 2, 2021Apt D2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Jun 22, 2021Apt L1
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE KITCHEN , THE 5th ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST LOCATED AT APT L1, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jun 16, 2021Apt C3
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THOUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Jun 10, 2021Apt C7
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FT AT CEILING AND 3 SQFT AT EAST WALL IN THE BATHROOM LOCATED AT APT C7, 3rd STORY, APARTMENT AT WEST
Class AClosed
Jun 1, 2021Apt F4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE BATHROOM LOCATED AT APT F4, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 1, 2021Apt F4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT F4, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
May 24, 2021Apt D2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
May 12, 2021Apt M5
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AOpen
May 12, 2021Apt M5
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AOpen
May 12, 2021Apt M5
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
May 12, 2021Apt F4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT F4, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
May 12, 2021Apt M5
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, WEST WALL IN THE FOYER LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
May 12, 2021Apt M5
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
May 7, 2021Apt H7
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT H7, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
Class AClosed
May 7, 2021Apt F6
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE KITCHEN LOCATED AT APT F6, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
Class AClosed
May 7, 2021Apt C3
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Apr 26, 2021Apt M5
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT AT ENTRANCE DOOR IN THE PRIVATE HALLWAY LOCATED AT APT M5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Apr 26, 2021Apt A4
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX. 1 SQ. FT.) AND EAST WALL (APPROX. 1 SQ. FT.) IN THE BATHROOM LOCATED AT APT A4, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Apr 23, 2021Apt K4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT K4, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Apr 23, 2021Apt K4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST, THE KITCHEN , THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT K4, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Apr 23, 2021Apt C1
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT DOOR IN THE BATHROOM LOCATED AT APT C1, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Apr 23, 2021Apt G6
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT G6, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Apr 23, 2021Apt G6
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ. FT AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT G6, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Apr 15, 2021Apt M2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT M2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt M2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT M2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt M2
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT M2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt M2
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND SOUTH WALL (APPROX. 4 SQ. FT.) IN THE BATHROOM LOCATED AT APT M2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt M2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT M2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt H7
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT H7, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
Class AClosed
Apr 15, 2021Apt H7
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & ALL WALLS IN THE BATHROOM LOCATED AT APT H7, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
Class AClosed
Apr 14, 2021
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY
Class AClosed
Apr 13, 2021Apt D2
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Mar 31, 2021
POST GAS LEAK NOTICE · POSTING/SIGNAGE
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosed
Mar 29, 2021Apt C1
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES WITH GROUTED JOINTS / CAULKING SURFACE OF VISIBLE MOLD AT SOUTH AND WEST WALLS AT BATHTUB IN THE BATHROOM LOCATED AT APT C1, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Mar 9, 2021Apt H7
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 3 SQ FT IN THE BATHROOM LOCATED AT APT H7, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed
Mar 9, 2021Apt J4
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT J4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''