Class AClosed
Jun 20, 2017
POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
Class AClosed
Jun 20, 2017
POST GAS LEAK NOTICE · POSTING/SIGNAGE
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Class AClosed
Jun 2, 2017Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
May 26, 2017Apt 4E
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT ALL UPPER AND LOWER WINDOW SASHES IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
May 26, 2017Apt 4D
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
May 26, 2017Apt 4E
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT ALL UPPER AND LOWER WINDOW SASHES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
May 8, 2017Apt 4B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE KITCHEN , THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 19, 2017Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CELINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 14, 2017Apt 2A
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER AND LOWER ESCUTCHEON PLATES AT ALL RISERS AT NORTH WALL. IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 12, 2017Apt 5C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Feb 22, 2017Apt 3B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE KITCHEN , THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Feb 22, 2017Apt 3B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ... 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Oct 19, 2015Apt 5D
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND WALLS IN THE KITCHENETTE LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Oct 19, 2015Apt 5D
REPAIR PLASTER · MAINTENANCE
SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILINGS AND WALLS IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jun 9, 2014Apt 3B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY , THE KITCHEN , THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Nov 18, 2011Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Nov 18, 2011Apt 6B
PAINT METAL · PAINTING
SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION : 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Oct 12, 2011Apt 4D
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4D, 4th STORY, APARTMENT AT WEST
Class AClosed
Sep 6, 2011Apt 4D
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Sep 6, 2011Apt 4D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Sep 6, 2011Apt 4D
PAINT METAL · PAINTING
SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Apr 12, 2011Apt 6B
REPAIR · MAINTENANCE
SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PILOT LIGHT AT GAS RANGE BURNER IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 12, 2011Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Jun 9, 2009Apt 2C
NO PEEP HOLE · PROTECTIVE DEVICES AND FIRE PROTECTION
SECTION 27-2041 ADM CODE PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED SO AS TO PERMIT A PERSON INSIDE THE DWELLING TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR ;;; IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE FOYER , THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, CEILING, SOUTH WALL, BASEBOARD AT EAST WALL, EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
—Apt 5B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH