stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

1 MARBLE HILL AVENUE

Manhattan · ZIP 10463 · BIN 1064643 · Kingsbridge-Marble Hill · Last violation Jun 10, 2026 · Last complaint Jun 9, 2026

NeighborhoodKingsbridge-Marble Hill
More violations than 92.8% of nearby buildings
More violations than 93% of buildings and more complaints than 97% of buildings in Kingsbridge-Marble Hill. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 481 violations · 723 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
84 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous84Class Bhazardous180
Housing Preservation & Development Violations
Total violations since 1992
1,521
43 per year avg.↑ Up 386% in the last 2 years (481 vs 99 prior 2 yrs)
Open violations
326
Class C (immed. haz.)ⓘ84
Class B (hazardous)ⓘ180
Rent-impairingⓘ21
Housing Preservation & Development Complaints
Total complaints since 2003
2,142
89 per year avg.↑ Up 330% in the last 2 years (723 vs 168 prior 2 yrs)
Complaint Resolution
No access15%Violation issued27%No violation44%Phone resolved13%Other1%(2,142)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ263 violations
Paintingⓘ73 violations
Extermination & Rodent Eradicationⓘ66 violations
Lead-Based Paintⓘ48 violations
Egressⓘ41 violations
Water Supplyⓘ36 violations
Cleaningⓘ22 violations
Heat And Hot Waterⓘ21 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ218 complaints
Mold & pestsⓘ186 complaints
Water & plumbingⓘ182 complaints
Heat / hot waterⓘ135 complaints
Electricalⓘ37 complaints
Appliancesⓘ21 complaints
Safety & fireⓘ14 complaints
Elevatorⓘ11 complaints
Outdoor / structuralⓘ5 complaints
Hide violations ↑See complaints →

Violation log

293 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days11% (35)
▪ 30–90 days20% (64)
▪ 3–12 months18% (60)
▪ 1–3 years23% (76)
▪ 3+ years28% (91)
Prior 4 yr.
Immed. Emergency4%3%
Emergency52%40%
Non-Emergency44%57%
(394)
(538)
Issued
Description
Class AClosed6DMar 10, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6DMar 10, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6DFeb 12, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6DFeb 12, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen1JDec 31, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING ELECTRICAL SWITCH PLATE IN THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen1JDec 31, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen1JDec 31, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM , THE FOYER LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen1JDec 31, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed4LDec 2, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT EAST
Class AClosed4LNov 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed1JNov 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed1JNov 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed1JNov 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen—Nov 7, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 1st STORY
Class AClosed—Oct 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AT PUBLIC HALL, 1st STORY, SECTION ''NORTH''
Class AClosed2KOct 3, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND EAST WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed5NSep 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed5CSep 30, 2024CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON GROUT AT CERAMIC WALL TILES AT WEST WALL AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5CSep 30, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET DOOR AT SINK IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2KSep 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed6DSep 30, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed6DSep 30, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed6PSep 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6P, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed3DSep 27, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE 4th ROOM FROM NORTH AT EAST, THE KITCHEN , THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed3DSep 27, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, WEST WALL IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed3DSep 27, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AOpen—Sep 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL AT PUBLIC HALL, 3rd STORY
Class AClosed—Sep 24, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST AND WEST WALLS AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 24, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL AT PUBLIC HALL, 4th STORY
Class AClosed—Sep 16, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 16, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 4th STORY, SECTION ''SOUTH''
Class AClosed—Sep 9, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 1st STORY
Class AClosed6EJul 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE 1st PRIVATE HALLWAY FROM NORTH, THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AOpen5MJul 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT BASEBOARD AT NORTH WALL AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen5MJul 22, 2024CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILES NORTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen5MApr 29, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET ON WEST WALL IN THE KITCHEN LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen5MApr 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen5MApr 25, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen5MApr 25, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen5CJan 15, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SINK BASE CABINET DRAW FACE IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
Class AClosed2DDec 11, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT EAST, THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed2FDec 11, 2023REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
Class AClosed6EDec 6, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DOOR FRAME INTERIOR AT 3 CLOSETS IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AClosed6EDec 6, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AClosed6EDec 6, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AOpen5MNov 20, 2023REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5MNov 20, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 9 SQ FTS ON SOUTH WALL IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen5MNov 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5MNov 20, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE SPRING AT UPPER WINDOW SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5MNov 20, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BELL BUZER FROM BUILDING ENTRANCE TO THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 10, 2025Apt 6D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Mar 10, 2025Apt 6D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Feb 12, 2025Apt 6D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Feb 12, 2025Apt 6D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen
Dec 31, 2024Apt 1J
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING ELECTRICAL SWITCH PLATE IN THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen
Dec 31, 2024Apt 1J
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen
Dec 31, 2024Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM , THE FOYER LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen
Dec 31, 2024Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed
Dec 2, 2024Apt 4L
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT EAST
Class AClosed
Nov 25, 2024Apt 4L
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 25, 2024Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed
Nov 25, 2024Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AClosed
Nov 25, 2024Apt 1J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM SOUTH AT WEST
Class AOpen
Nov 7, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 1st STORY
Class AClosed
Oct 30, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AT PUBLIC HALL, 1st STORY, SECTION ''NORTH''
Class AClosed
Oct 3, 2024Apt 2K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND EAST WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Sep 30, 2024Apt 5N
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Sep 30, 2024Apt 5C
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON GROUT AT CERAMIC WALL TILES AT WEST WALL AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 30, 2024Apt 5C
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET DOOR AT SINK IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 30, 2024Apt 2K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Sep 30, 2024Apt 6D
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 30, 2024Apt 6D
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 30, 2024Apt 6P
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6P, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Sep 27, 2024Apt 3D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE 4th ROOM FROM NORTH AT EAST, THE KITCHEN , THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 27, 2024Apt 3D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, WEST WALL IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 27, 2024Apt 3D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AOpen
Sep 25, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL AT PUBLIC HALL, 3rd STORY
Class AClosed
Sep 24, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST AND WEST WALLS AT PUBLIC HALL, 1st STORY
Class AClosed
Sep 24, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL AT PUBLIC HALL, 4th STORY
Class AClosed
Sep 16, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 1st STORY
Class AClosed
Sep 16, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 4th STORY, SECTION ''SOUTH''
Class AClosed
Sep 9, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 1st STORY
Class AClosed
Jul 30, 2024Apt 6E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE 1st PRIVATE HALLWAY FROM NORTH, THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AOpen
Jul 22, 2024Apt 5M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT BASEBOARD AT NORTH WALL AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen
Jul 22, 2024Apt 5M
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILES NORTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen
Apr 29, 2024Apt 5M
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET ON WEST WALL IN THE KITCHEN LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
Apr 25, 2024Apt 5M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
Apr 25, 2024Apt 5M
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
Apr 25, 2024Apt 5M
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen
Jan 15, 2024Apt 5C
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SINK BASE CABINET DRAW FACE IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
Class AClosed
Dec 11, 2023Apt 2D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT EAST, THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Dec 11, 2023Apt 2F
REPAIR LEAKY FAUCETS · WATER SUPPLY
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
Class AClosed
Dec 6, 2023Apt 6E
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DOOR FRAME INTERIOR AT 3 CLOSETS IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AClosed
Dec 6, 2023Apt 6E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AClosed
Dec 6, 2023Apt 6E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Class AOpen
Nov 20, 2023Apt 5M
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 20, 2023Apt 5M
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 9 SQ FTS ON SOUTH WALL IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen
Nov 20, 2023Apt 5M
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 20, 2023Apt 5M
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE SPRING AT UPPER WINDOW SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 20, 2023Apt 5M
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BELL BUZER FROM BUILDING ENTRANCE TO THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Page 2 of 6
← PrevNext →